Over 22,717 phone lines have been converted or suspended so far!
VoIP service will be deployed in five waves (Waves 0-4) based on a variety of factors.
Complete | |
In progress |
Wave 0
Internal testing of deployment process.
Code | Name | Overall Status | Survey | Recommendation | Remediation | Deployment | Notes |
---|---|---|---|---|---|---|---|
COM | Computation Center | Deployment complete. | |||||
CLA | Liberal Arts Bldg. | n/a | n/a | n/a | Deployment complete | ||
CRB | Computational Resources Bldg. |
| Deployment complete | ||||
CSP | Center for School Partnerships | n/a | n/a | n/a | Deployment complete | ||
GDC | Dell Computer Science Hall | n/a | n/a | n/a | | Deployment complete | |
SER | Service Bldg. |
| Deployment complete |
Wave 1
Code | Name | Overall Status | Survey | Recommendation | Remediation | Deployment | Notes |
---|---|---|---|---|---|---|---|
POB (ACE) | Peter O'Donnell, Jr. Building |
|
|
|
|
| Deployment complete. |
ATT | AT&T Executive Education and Conference Center |
|
|
|
|
| Deployment complete. |
BAT | Batts Hall |
|
|
|
|
| Deployment complete. |
BEN | Benedict Hall |
|
|
|
|
| Deployment complete. |
BSB | Basketball Support Building |
|
|
|
|
| Deployment complete. |
BUR | Burdine Hall |
|
|
|
|
| Deployment complete. |
CS6 | Central Chilling Station No. 6 |
|
|
|
|
| Deployment complete. |
CBA | McCombs School of Business |
|
|
|
|
| Deployment complete. |
GEA | Mary E. Gearing Hall |
|
|
|
|
| Deployment Complete. |
GSB | Graduate School of Business Bldg. |
|
|
|
|
| Deployment complete. |
GUG | UT Administration Parking Garage |
|
|
|
|
| Deployment complete. |
MBB | Moffett Molecular Biology Bldg. |
|
|
|
|
| Deployment Complete. |
MEZ | Mezes Hall |
|
|
|
|
| Deployment complete. |
NHB | Norman Hackerman Bldg. |
|
|
|
|
| Deployment complete. |
NOA | North Office Building A |
|
|
|
|
| Deployment complete. |
NUR | Nursing School |
|
|
|
|
| Deployment complete. |
PAT | J. T. Patterson Labs |
|
|
|
|
| Deployment complete. |
PPA | Hal C. Weaver Power Plant Annex |
|
|
|
|
| Deployment complete. |
PPE | Hal C. Weaver Power Plant Expansion |
|
|
|
|
| Deployment Complete. |
PPL | Hal C. Weaver Power Plant |
|
|
|
|
| Deployment complete. |
RLM | Robert Lee Moore Hall |
|
|
|
|
| Deployment complete. |
SEA | Sarah M. & Charles E. Seay Building |
|
|
|
|
| Deployment complete. |
SWG | Speedway Garage |
|
|
|
|
| Deployment complete. |
WEL | Robert A. Welch Hall |
|
|
|
|
| Deployment complete. |
WRW | W. R. Woolrich Labs |
|
|
|
|
| Deployment complete. |
UTA | UT Administration Bldg |
|
|
|
|
| Deployment complete. |
UTC | University Teaching Center |
|
|
|
|
| Deployment complete. |
Wave 2
Code | Name | Overall Status | Survey | Recommendation | Remediation | Deployment | Notes |
---|---|---|---|---|---|---|---|
AHG | Anna Hiss Gymnasium |
|
|
|
|
| Deployment complete. |
ANB | Arno Nowotny Building |
|
|
|
|
| Deployment complete. |
BEL | L. Theo Belmont Hall |
|
|
|
|
| Deployment complete. |
BMC | Belo Center for New Media |
|
|
|
|
| Deployment complete. |
CAL | Calhoun Hall |
|
|
|
|
| Deployment complete. |
CCJ | John B. Connally Center for Justice |
|
|
|
|
| Deployment complete. |
CDA | Comal Child Development Center Annex |
|
|
|
|
| Deployment complete. |
CDL | Collections Deposit Library |
|
|
|
|
| Deployment complete. |
CEE | Continuing Engineering Education |
|
|
|
|
| Deployment complete. |
CLK | Caven Clark Field Support Building |
|
|
|
|
| Deployment complete. |
CMA | Jesse H. Jones Communications Center - Building A |
|
|
|
|
| Deployment complete. |
CMB | Jesse H. Jones Communications Center - Building B |
|
|
|
|
| Deployment complete. |
CML | Child Development Center |
|
|
|
|
| Deployment complete. |
CPE | Chemical and Petroleum Engineering Building |
|
|
|
|
| Deployment complete. |
CS3 | Chilling Station No. 3 |
|
|
|
|
| Deployment complete. |
CS4 | Chilling Station No. 4 |
|
|
|
|
| Deployment complete. |
CS5 | Chilling Station No. 5 |
|
|
|
|
| Deployment complete. |
CTB | Chemical Transfer Building |
|
|
|
|
| This building will not transition to VoIP. |
DEV | Development Office Building |
|
|
|
|
| Deployment is complete. |
ECJ | Ernest Cockrell Jr. Hall |
|
|
|
|
| Deployment complete. |
EGS | East Grandstand Stadium |
|
|
|
|
| Deployment complete. |
ETC | Engineering Teaching Center II |
|
|
|
|
| Deployment complete. |
FC1 | Facilities Complex Building 1 |
|
|
|
|
| Deployment complete. |
FC2 | Facilities Complex Building 2 |
|
|
|
|
| Deployment complete. |
FC3 | Facilities Complex Building 3 |
|
|
|
|
| Deployment complete. |
FC5 | Facilities Complex Building 5 |
|
|
|
|
| Deployment Complete. |
FC6 | Facilities Complex Building 6 |
|
|
|
|
| Deployment Complete.
|
FC7 | Facilities Complex Building 7 |
|
|
|
|
| Deployment complete.
|
FC8 | Facilities Complex Building 8 |
|
|
|
|
| Deployment complete.
|
FC9 | Facilities Complex Building 9 |
|
|
|
|
| Deployment complete. |
FNT | Larry R. Faulkner Nano Science and Technology Building |
|
|
|
|
| Deployment complete. |
GAR | Garrison Hall |
|
|
|
|
| Deployment complete. |
GOL | Goldsmith Hall |
|
|
|
|
| Deployment complete. |
GRE | Gregory Gymnasium |
|
|
|
|
| Deployment Complete. |
HSM | William Randolph Hearst Building (formerly CMC) |
|
|
|
|
| Deployment Complete. |
HMA | Hogg Memorial Auditorium |
|
|
|
|
| Deployment Complete. |
HSS | Harris Substation |
|
|
|
|
| This building will not transition to VoIP. |
IPF | Indoor Practice Facility |
|
|
|
|
| This building will not transition to VoIP |
IPS | Plaza 290 |
|
|
|
|
| Deployment complete. |
JHH | John W. Hargis Hall |
|
|
|
|
| Deployment complete. |
JON | Jesse H. Jones Hall |
|
|
|
|
| Deployment complete. |
LBJ | Lyndon B. Johnson Library |
|
|
|
|
| Deployment complete. |
MNC | Moncrief-Neuhaus Athletics Center |
|
|
|
|
| Deployment complete. |
MSB | Mail Services Building |
|
|
|
|
| This building will not transition to VoIP. |
NEZ | North End Zone |
|
|
|
|
| Deployment complete. |
NMS | Neural Molecular Science Building |
|
|
|
|
| Deployment complete. |
PAC | Performing Arts Center |
|
|
|
|
| Deployment complete. |
PAI | T.S. Painter Hall |
|
|
|
|
| Deployment complete. |
PPB | Printing and Press Building |
|
|
|
|
| Deployment complete. |
RSC | Recreational Sports Center |
|
|
|
|
| Deployment complete. |
SRH | Sid Richardson Hall |
|
|
|
|
| Deployment complete. |
STD | Darrell K Royal-Texas Memorial Stadium |
|
|
|
|
| Deployment complete. |
SW7 | 2617 Speedway |
|
|
|
|
| Deployment complete. |
TCC | Joe C. Thompson Conference Center |
|
|
|
|
| Deployment complete. |
TNH | Townes Hall |
|
|
|
|
| Deployment complete. |
UA9 | 2609 University Avenue |
|
|
|
|
| Deployment complete. |
WCH | Will C. Hogg Building |
|
|
|
|
| Deployment complete. |
Wave 3
The buildings listed below have been identified as Wave 3, which is anticipated to span from June 2014 to March 2015.
Code | Name | Overall Status | Survey | Recommendation | Remediation | Deployment | Notes |
---|---|---|---|---|---|---|---|
A17 | ARL McKinney Wing (PRC 190) |
|
|
|
|
| This building will not be transitioning to VoIP. |
AOC | Atrium Office Center (UT Charter School) |
|
|
|
|
| This building will not transition to VoIP. |
ARL | ARL Main Building (PRC 35) |
|
|
|
|
| This building will not transition to VoIP. |
ART | Art Building and Museum |
|
|
|
|
| Deployment complete. |
AS2 | Sub-Sonic Wind Tunnel (PRC 124) |
|
|
|
|
| This building will not transition to VoIP. |
ASH | Ashbel Smith Hall |
|
|
|
|
| This building will not transition to VoIP. |
BE1 | Beg. Mineral Studies Lab (PRC 131) |
|
|
|
|
| Deployment complete. |
BE2 | Beg. Repository (PRC 132) |
|
|
|
|
| Deployment complete. |
BEG | Beg. Administration Building (PRC 130) |
|
|
|
|
| Deployment complete. |
BIO/BOT | Biological Laboratories/Biological Greenhouse |
|
|
|
|
| Deployment complete. |
BME | Biomedical Engineering Building |
|
|
|
|
| Deployment complete. |
BRB | Bernard and Audre Rapoport Building |
|
|
|
|
| Deployment complete. |
BS2 | Oehs Storage Building B(PRC 148) |
|
|
|
|
| This building will not transition to VoIP |
BS4 | Hazardous Materials Transfer Building (PRC 183) |
|
|
|
|
| This building will not transition to VoIP |
BTL | Battle Hall |
|
|
|
|
| Deployment complete. |
CCF | Caven Lacrosse and Sports Center at Clark Field |
|
|
|
|
| This building will not transition to VoIP |
CM4 | CMRG - Research Offices (PRC 201) |
|
|
|
|
| Deployment complete. |
CMR | CMRG Concrete Durability Center (PRC 18B) |
|
|
|
|
| Deployment complete. |
CP1 | PRC Central Chilling Station (PRC 129) |
|
|
|
|
| Deployment complete. |
CP2 | Prc Chilling Station 2 (PRC 202) |
|
|
|
|
| This building will not transition to VoIP. |
CPB | Compactor Building |
|
|
|
|
| This building will not transition to VoIP. |
CW1 | Central Water Resources Lab |
|
|
|
|
| This building will not transition to VoIP. |
CWR | Central Water Resources Administration (PRC 119) |
|
|
|
|
| Deployment complete. |
DCP | Denton A. Cooley Pavilion |
|
|
|
|
| Deployment complete. |
DFA | E. William Doty Fine Arts Building |
|
|
|
|
| Deployment complete. |
DFF | UFCU Disch-Falk Field |
|
|
|
|
| Deployment complete. |
EAS | Edgar A. Smith Building |
|
|
|
|
| Deployment complete. |
EER | E.E.R.L./C.E.S.E. (PRC 16) |
|
|
|
|
| Deployment complete. |
EM1 | CES Boiler Building (PRC 134) |
|
|
|
|
| This building will not transition to VoIP. |
EM2 | EME Annex (PRC 161) |
|
|
|
|
|
This building will not transition to VoIP. |
EME | Elec Mech/Eng Res Ctr (PRC 133) |
|
|
|
|
| Deployment complete. |
EPS | E.P. Schoch Building |
|
|
|
|
| Deployment complete. |
ERC | Frank C. Erwin Jr. Special Events Center |
|
|
|
|
| Deployment complete. |
ETS | UT Elec & Telecom STG |
|
|
|
|
| This building will not transition to VoIP. |
FS1 | Ferguson Engineering Lab Annex |
|
|
|
|
| Deployment complete. |
FS2 | NEES at Utexas/FSL Lab Annex (PRC 46) |
|
|
|
|
| Deployment complete. |
FSL | Ferguson Lab - Main Building (PRC 24) |
|
|
|
|
| Deployment complete. |
HLP | Hartland Plaza School of Social Work |
|
|
|
|
| Deployment complete. |
HDR | Library High Density Repository |
|
|
|
|
| This building will not transition to VoIP. |
IRC | Imaging Research Center (PRC 197) |
|
|
|
|
| This building will not transition to VoIP. |
JGB | Jackson Geological Sciences Building |
|
|
|
|
| Deployment complete. |
LSF | Library Storage Facility |
|
|
|
|
| Deployment complete. |
MAG | Manor Garage |
|
|
|
|
| Deployment complete. |
MC1 (WR1) | MC1 |
|
|
|
|
| Deployment complete. |
MC2 (WR2) | MC2 |
|
|
|
|
| Deployment complete. |
MER | Microelect & Eng Resource Center (PRC 160) |
|
|
|
|
| Deployment complete. |
MMS/ MFH | Mike A. Myers Track and Soccer Stadium/ Richard Mithoff Track and Soccer Fieldhouse |
|
|
|
|
| Deployment complete. |
MRH/MBE | Music Recital Hall (Includes Sarah and Ernest Butler School of Music-MBE) |
|
|
|
|
| Deployment complete. |
NEL | Nuclear Eng Teaching Lab (PRC 159) |
|
|
|
|
| ITS will be scheduling the deployment. |
P15 | PRC Physical Plant Admin (PRC 15) |
|
|
|
|
| Deployment complete. |
P19 | PRC Custodial/Safety/Guards (PRC 19) |
|
|
|
|
| Deployment complete. |
P25 | PRC Supply Center (PRC 25) |
|
|
|
|
| Deployment complete. |
P30 | Records Storage #1 (PRC 30) |
|
|
|
|
| This building will not transition VoIP. |
P33 | Records Storage #2 (PRC 33) |
|
|
|
|
| Deployment complete. |
P45 | UT Physical Plant Warehouse (PRC 45) |
|
|
|
|
| Deployment complete. |
PC1 | Communication Tower & Mechanical Room |
|
|
|
|
| This building will not transition to VoIP. |
PE1 | Petroleum & Geosys Engineering (PRC 17) |
|
|
|
|
| This building will not transition to VoIP. |
PHR | Pharmacy Building |
|
|
|
|
| Deployment complete. |
PX3 | Petex (PRC 2) |
|
|
|
|
| Deployment complete. |
ROC | Research Office Complex (PRC 196) |
|
|
|
|
| Deployment complete. |
ROS | Res. Off. Complex Support Building (PRC 198) |
|
|
|
|
| This building will not transition to VoIP. |
SBS | Red and Charline McCombs Field |
|
|
|
|
| Deployment complete. |
SSB | Student Services Building |
|
|
|
|
| Deployment complete. |
SV1 | PRC Service Center Trades |
|
|
|
|
| Deployment complete. |
SV2 | PRC Service Center Auto & Grnds (PRC 135) |
|
|
|
|
| Deployment complete. |
T5A | Tarl Mod. Unit 5A - Gault (PRC 5A) |
|
|
|
|
| This building will not be transitioning to VoIP. |
T5B | Tarl Mod. Unit 5B - Marl (PRC 5B) |
|
|
|
|
| Deployment complete. |
T5C | Tarl Mod. Unit 5C - Office (PRC 5C) |
|
|
|
|
| This building will not be transitioning to VoIP. |
T5D | Tarl Mod. Unit 5D - CLSRM (PRC 5D) |
|
|
|
|
| This building will not transition to VoIP. |
TAR | Texas Archeological Res. Lab (PRC 5) |
|
|
|
|
| Deployment complete. |
TCB | J. Neils Thompson Commons |
|
|
|
|
| Deployment complete. |
TM1 | Non-Vert. Paleontology Lab (PRC 122) |
|
|
|
|
| Deployment complete. |
TM2 | TMM & MSI Storage (PRC 18A) |
|
|
|
|
| This building will not transition to VoIP. |
TMM | Texas Memorial Museum |
|
|
|
|
| Deployment complete. |
TSG | 27th Street Garage |
|
|
|
|
| Deployment complete. |
UPB | University Police Building |
|
|
|
|
| Deployment complete. |
UTX | Etter-Harbin Alumni Center |
|
|
|
|
| This building will not transition to VoIP. |
VP1 | Vert Paleontology Annex |
|
|
|
|
| This building will not transition to VoIP. |
VPL | Vertebrae Paleontology (PRC 6) |
|
|
|
|
| Deployment complete. |
WAG | Waggener Hall |
|
|
|
|
| Deployment complete. |
WIN | F. Loren Winship Drama Building |
|
|
|
|
| Deployment complete. |
WMB | West Mall Office Building |
|
|
|
|
| Deployment complete. |
WPR | West Pickle Research Center (PRC 156) |
|
|
|
|
| Deployment complete. |
Wave 4
The buildings listed below have been identified as Wave 4, which is anticipated to span from December 2014 to August 2015. The deployment order for the buildings within this wave is to be determined.
Code | Name | Overall Status | Survey | Recommendation | Remediation | Deployment | Notes |
---|---|---|---|---|---|---|---|
ACA | Academic Annex |
|
|
|
|
| Deployment complete. |
ADH | Almetris Duren Hall |
|
|
|
|
| Deployment complete. |
AND | Andrews Dormitory |
|
|
|
|
| Deployment complete. |
ARC | Animal Resources Center |
|
|
|
|
| Deployment complete. |
BFL | Brackenridge Field Labs |
|
|
|
|
| Deployment complete. |
BHD | Brackenridge Hall Dormitory |
|
|
|
|
| Deployment Complete. Remaining Analog. |
BLD | Blanton Dormitory |
|
|
|
|
| Deployment complete. |
BMA | Blanton Museum of Art |
|
|
|
|
| Deployment complete. |
BRG | Brazos Garage |
|
|
|
|
| Deployment complete. |
BRK | Brackenridge Apartment Office |
|
|
|
|
| Deployment complete. |
BWY | 2616 Wichita |
|
|
|
|
| Deployment complete. |
CCG | Conference Center Garage |
|
|
|
|
| Deployment complete. |
COE | University Coop East (Cont. Legal Ed.) |
|
|
|
|
| Deployment complete. |
CRD | Carothers Dormitory |
|
|
|
|
| Deployment complete. |
CRH | Creekside Residence Hall |
|
|
|
|
| Deployment complete. |
DCE | Diversity & Community Engagement Center |
|
|
|
|
| Deployment complete. |
DPI | Dell Pediatric Research Institute |
|
|
|
|
| Deployment complete. |
FAC | Peter T. Flawn Academic Center |
|
|
|
|
| Deployment complete. |
FDH | J. Frank Dobie House |
|
|
|
|
| ITS will be scheduling the deployment. |
GEB | Dorothy L. Gebauer Building |
|
|
|
|
| Deployment complete. |
HRC | Harry Ransom Center |
|
|
|
|
| Deployment complete. |
HRH | Homer Rainey Hall |
|
|
|
|
| Deployment complete. |
IC2 | 2815 San Gabriel (IC2 Institute) |
|
|
|
|
| Deployment complete. |
INT/TR1 | International Offices |
|
|
|
|
| Deployment complete. |
JES | Beauford H. Jester Center |
|
|
|
|
| Deployment complete. |
JWC | Johnson Wildflower Complex |
|
|
|
|
| Remote location. This building will not transition to VoIP. |
KIN | Kinsolving Dormitory |
|
|
|
|
| Deployment complete. |
LAC | Lake Austin Center |
|
|
|
|
| Deployment complete. |
LCH | Littlefield Carriage House |
|
|
|
|
| Deployment complete. |
LDH | Longhorn Dining Facility |
|
|
|
|
| Deployment Complete. |
LFF | Littlefield Fountain |
|
|
|
|
| This building will not transition to VoIP. |
LFH | Littlefield Home |
|
|
|
|
| Deployment complete. |
LLA | LLA Living Learning Center |
|
|
|
|
|
Deployment complete. |
LLB | LLB Living Learning Center |
|
|
|
|
| Deployment complete. |
LLC | LLC Living Learning Center |
|
|
|
|
| Deployment complete. |
LLD | LLD Living Learning Center |
|
|
|
|
| Deployment complete. |
LLE | LLE Living Learning Center |
|
|
|
|
| Deployment complete. |
LLF | LLF Living Learning Center |
|
|
|
|
| Deployment complete. |
LTD | Littlefield Dormitory |
|
|
|
|
| Deployment complete. |
LTH | Laboratory Theater Building |
|
|
|
|
| Deployment complete. |
MAI | Main Building |
|
|
|
|
| Deployment complete. |
MHD | Moore-Hill Dormitory |
|
|
|
|
| Deployment complete. |
PAR | Parlin Hall |
|
|
|
|
| Deployment complete. |
PCL | Perry-Castaneda Library |
|
|
|
|
| Deployment complete. |
PF3 | Park Forest (Building III) |
|
|
|
|
| Deployment complete. |
PHD | Prather Hall Dormitory |
|
|
|
|
| Deployment complete. |
RHD | Roberts Hall Dormitory |
|
|
|
|
| Deployment complete. |
SAC | Student Activity Center |
|
|
|
|
| Deployment Complete. |
SAG | San Antonio Garage |
|
|
|
|
| Deployment complete. |
SJG | San Jacinto Garage |
|
|
|
|
| Deployment complete. |
SJH | San Jacinto Residence Hall |
|
|
|
|
| Deployment complete. |
SSE | 3316 Grandview St |
|
|
|
|
| Deployment complete. |
SSW | School of Social Work Building |
|
|
|
|
| Deployment complete. |
SUT | Sutton Hall |
|
|
|
|
| Deployment complete. |
SZB | George I. Sanchez Building |
|
|
|
|
| Deployment complete. |
TES | Thermal Energy Storage |
|
|
|
|
| This building will not transition to VoIP. |
TRG | Trinity Garage |
|
|
|
|
| Deployment complete. |
TSC | Lee and Joe Jamail Texas Swimming Center |
|
|
|
|
| Deployment complete. |
UIL | University Interscholastic League |
|
|
|
|
| Deployment complete. |
UNB | Union Building |
|
|
|
|
| Deployment complete. |
WWH | Walter Webb Hall |
|
|
|
|
| Deployment complete. |