Over 22,717 phone lines have been converted or suspended so far! 

 

 VoIP service will be deployed in five waves (Waves 0-4) based on a variety of factors.

(tick)

Complete

In progress

Wave 0

Internal testing of deployment process.

Code

Name

Overall Status

Survey

Recommendation

Remediation

Deployment

Notes

COM

Computation Center

(tick)

(tick)(tick)(tick)

(tick)

Deployment complete.

CLA

Liberal Arts Bldg.

(tick)

n/an/an/a

(tick)

Deployment complete

CRB

Computational Resources Bldg.

(tick)

(tick)

(tick)

(tick) 

(tick)

Deployment complete

CSP

Center for School Partnerships

(tick)n/an/an/a(tick)

Deployment complete

GDC

Dell Computer Science Hall

(tick)

n/a

n/an/a

 (tick) 

Deployment complete

SER

Service Bldg.

(tick)

(tick)

(tick)

 

(tick)

(tick)

Deployment complete

Wave 1

 

Code

Name

Overall Status

Survey

Recommendation

Remediation

Deployment

Notes

POB (ACE)

Peter O'Donnell, Jr. Building

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete. 

ATT

AT&T Executive Education and Conference Center

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

BAT

Batts Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

BEN

Benedict Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

BSB

Basketball Support Building

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

BUR

Burdine Hall

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

CS6

Central Chilling Station No. 6

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CBA

McCombs School of Business

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

GEA

Mary E. Gearing Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment Complete.

GSB

Graduate School of Business Bldg.

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

GUG

UT Administration Parking Garage

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

MBB

Moffett Molecular Biology Bldg.

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment Complete.

MEZ

Mezes Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

NHB

Norman Hackerman Bldg.

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

NOA

North Office Building A

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

NUR

Nursing School

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

PAT

J. T. Patterson Labs

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

PPA

Hal C. Weaver Power Plant Annex

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

PPE

Hal C. Weaver Power Plant Expansion

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment Complete.

PPL

Hal C. Weaver Power Plant

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

RLM

Robert Lee Moore Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

SEA

Sarah M. & Charles E. Seay Building

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

SWG

Speedway Garage

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

WEL

Robert A. Welch Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

WRW

W. R. Woolrich Labs

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

UTA

UT Administration Bldg

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete

UTC

University Teaching Center

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

Wave 2

 

Code

Name

Overall Status

Survey

Recommendation

Remediation

Deployment

Notes

AHG

Anna Hiss Gymnasium

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

ANB

Arno Nowotny Building

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

BEL

L. Theo Belmont Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

BMC

Belo Center for New Media

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CAL

Calhoun Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CCJ

John B. Connally Center for Justice

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CDA

Comal Child Development Center Annex

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CDL

Collections Deposit Library

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CEE

Continuing Engineering Education

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CLK

Caven Clark Field Support Building

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CMA

Jesse H. Jones Communications Center - Building A

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CMB

Jesse H. Jones Communications Center - Building B

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CML

Child Development Center

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CPE

Chemical and Petroleum Engineering Building

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CS3

Chilling Station No. 3

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CS4

Chilling Station No. 4

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CS5

Chilling Station No. 5

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CTB

Chemical Transfer Building

(tick)
(tick)
(tick)
(tick)
(tick)

This building will not transition to VoIP.

DEV

Development Office Building

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment is complete.

ECJ

Ernest Cockrell Jr. Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

EGS

East Grandstand Stadium

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

ETC

Engineering Teaching Center II

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

FC1

Facilities Complex Building 1

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.  

FC2

Facilities Complex Building 2

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

FC3

Facilities Complex Building 3

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

FC5

Facilities Complex Building 5

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment Complete.

FC6

Facilities Complex Building 6

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment Complete.

 

FC7

Facilities Complex Building 7

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

 

FC8

Facilities Complex Building 8

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

 

FC9Facilities Complex Building 9
(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.
FNTLarry R. Faulkner Nano Science and Technology Building
(tick)
(tick)

(tick)

(tick)

(tick)

Deployment complete.

GAR

Garrison Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

GOL

Goldsmith Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

GRE

Gregory Gymnasium

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment Complete.

HSMWilliam Randolph Hearst Building (formerly CMC)
(tick)
(tick)
(tick)
(tick)
(tick)
Deployment Complete.

HMA

Hogg Memorial Auditorium

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment Complete.

HSS

Harris Substation

(tick)
(tick)
(tick)
(tick)
(tick)

This building will not transition to VoIP.

IPF

Indoor Practice Facility

(tick)
(tick)
(tick)
(tick)
(tick)

This building will not transition to VoIP

IPS

Plaza 290

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

JHH

John W. Hargis Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

JON

Jesse H. Jones Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

LBJ

Lyndon B. Johnson Library

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

MNC

Moncrief-Neuhaus Athletics Center

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

MSB

Mail Services Building

(tick)
(tick)
(tick)
(tick)
(tick)

This building will not transition to VoIP.

NEZ

North End Zone

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

NMS

Neural Molecular Science Building

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

PAC

Performing Arts Center

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

PAI

T.S. Painter Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

PPB

Printing and Press Building

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

RSC

Recreational Sports Center

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

SRH

Sid Richardson Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

STD

Darrell K Royal-Texas Memorial Stadium

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

SW7

2617 Speedway

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

TCC

Joe C. Thompson Conference Center

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

TNH

Townes Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

UA9

2609 University Avenue

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

WCH

Will C. Hogg Building

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

Wave 3

The buildings listed below have been identified as Wave 3, which is anticipated to span from June 2014 to March 2015.

 

Code

Name

Overall Status

Survey

Recommendation

Remediation

Deployment

Notes

A17

ARL McKinney Wing (PRC 190)

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not be transitioning to VoIP.

AOC

Atrium Office Center (UT Charter School)

(tick)
(tick)
(tick)
(tick)
(tick)

This building will not transition to VoIP.

ARL

ARL Main Building (PRC 35)

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

ART

Art Building and Museum

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

AS2Sub-Sonic Wind Tunnel (PRC 124)
(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

ASH

Ashbel Smith Hall

(tick)
(tick)
(tick)
(tick)
(tick)

This building will not transition to VoIP.

BE1

Beg. Mineral Studies Lab (PRC 131)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

BE2

Beg. Repository (PRC 132)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

BEG

Beg. Administration Building (PRC 130)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

BIO/BOT

Biological Laboratories/Biological Greenhouse

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

BME

Biomedical Engineering Building

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

BRB

Bernard and Audre Rapoport Building

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.
 BS2Oehs Storage Building B(PRC 148)
(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP

BS4

Hazardous Materials Transfer Building (PRC 183)

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP

BTL

Battle Hall

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

CCF

Caven Lacrosse and Sports Center at Clark Field

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP

CM4

CMRG - Research Offices (PRC 201)

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CMR

CMRG Concrete Durability Center (PRC 18B)

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CP1

PRC Central Chilling Station (PRC 129)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.
 CP2 Prc Chilling Station 2 (PRC 202)
(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

CPB

Compactor Building

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

CW1

Central Water Resources Lab

(tick)
(tick)
(tick)
(tick)
(tick)

This building will not transition to VoIP.

CWR

Central Water Resources Administration (PRC 119)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

DCP

Denton A. Cooley Pavilion

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

DFAE. William Doty Fine Arts Building
(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.
DFF

UFCU Disch-Falk Field

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

EAS

Edgar A. Smith Building

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

EER

E.E.R.L./C.E.S.E. (PRC 16)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

EM1

CES Boiler Building (PRC 134)

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

EM2

EME Annex (PRC 161)

(tick)
(tick)
(tick)
(tick)
(tick)

 

This building will not transition to VoIP.

EME

Elec Mech/Eng Res Ctr (PRC 133)

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

EPS

E.P. Schoch Building

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

ERC

Frank C. Erwin Jr. Special Events Center

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

ETS

UT Elec & Telecom STG

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

FS1

Ferguson Engineering Lab Annex

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

FS2

NEES at Utexas/FSL Lab Annex (PRC 46)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

FSL

Ferguson Lab - Main Building (PRC 24)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.
HLPHartland Plaza School of Social Work
(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

HDR

Library High Density Repository

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

IRC

Imaging Research Center (PRC 197)

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

JGB

Jackson Geological Sciences Building

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

LSF

Library Storage Facility

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

MAG

Manor Garage

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

MC1 (WR1)

MC1

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

MC2 (WR2)

MC2

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

MER

Microelect & Eng Resource Center (PRC 160)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

MMS/ MFH

Mike A. Myers Track and Soccer Stadium/ Richard Mithoff Track and Soccer Fieldhouse

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.
MRH/MBEMusic Recital Hall (Includes Sarah and Ernest Butler School of Music-MBE)
(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

NEL

Nuclear Eng Teaching Lab (PRC 159)

(tick)
(tick)
(tick)
ITS will be scheduling the deployment.

P15

PRC Physical Plant Admin (PRC 15)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

P19

PRC Custodial/Safety/Guards (PRC 19)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

P25

PRC Supply Center (PRC 25)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

P30

Records Storage #1 (PRC 30)

(tick)
(tick)
(tick)
(tick)
(tick)

This building will not transition VoIP.

P33

Records Storage #2 (PRC 33)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

P45

UT Physical Plant Warehouse (PRC 45)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

PC1

Communication Tower & Mechanical Room

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

PE1

Petroleum & Geosys Engineering (PRC 17)

(tick)
(tick)
(tick)
(tick)
(tick)

This building will not transition to VoIP.

PHR

Pharmacy Building

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

PX3

Petex (PRC 2)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

ROC

Research Office Complex (PRC 196)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

ROS

Res. Off. Complex Support Building (PRC 198)

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

SBS

Red and Charline McCombs Field

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

SSB

Student Services Building

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

SV1

PRC Service Center Trades

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

SV2

PRC Service Center Auto & Grnds (PRC 135)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete. 

T5A

Tarl Mod. Unit 5A - Gault (PRC 5A)

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not be transitioning to VoIP.

T5B

Tarl Mod. Unit 5B - Marl (PRC 5B)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

T5C

Tarl Mod. Unit 5C - Office (PRC 5C)

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not be transitioning to VoIP.

T5D

Tarl Mod. Unit 5D - CLSRM (PRC 5D)

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

TAR

Texas Archeological Res. Lab (PRC 5)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

TCB

J. Neils Thompson Commons

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

TM1

Non-Vert. Paleontology Lab (PRC 122)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

TM2

TMM & MSI Storage (PRC 18A)

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

TMM

Texas Memorial Museum

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.
TSG27th Street Garage
(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

UPB

University Police Building

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

UTX

Etter-Harbin Alumni Center

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

VP1

Vert Paleontology Annex

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

VPL

Vertebrae Paleontology (PRC 6)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

WAG

Waggener Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

WINF. Loren Winship Drama Building
(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

WMB

West Mall Office Building

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

WPR

West Pickle Research Center (PRC 156)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

Wave 4

The buildings listed below have been identified as Wave 4, which is anticipated to span from December 2014 to August 2015. The deployment order for the buildings within this wave is to be determined.

Code

Name

Overall

Status

Survey

Recommendation

Remediation

Deployment

Notes

ACA

Academic Annex

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

ADH

Almetris Duren Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

AND

Andrews Dormitory

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

ARC

Animal Resources Center

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.
BFLBrackenridge Field Labs
(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

BHD

Brackenridge Hall Dormitory

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment Complete. Remaining Analog.

BLD

Blanton Dormitory

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

BMA

Blanton Museum of Art

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

BRG

Brazos Garage

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.
BRK Brackenridge Apartment Office
(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

BWY

2616 Wichita

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

CCG

Conference Center Garage

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

COE

University Coop East (Cont. Legal Ed.)

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CRD

Carothers Dormitory

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

CRH

Creekside Residence Hall

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

DCE

Diversity & Community Engagement Center

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

DPI

Dell Pediatric Research Institute

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

FAC

Peter T. Flawn Academic Center

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

FDH

J. Frank Dobie House

(tick)
(tick)
(tick)
ITS will be scheduling the deployment.

GEB

Dorothy L. Gebauer Building

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

HRC

Harry Ransom Center

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

HRH

Homer Rainey Hall

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

IC2

2815 San Gabriel (IC2 Institute)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.
INT/TR1International Offices
(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.
 JES Beauford H. Jester Center
(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.
JWCJohnson Wildflower Complex
(tick)
(tick)
(tick)
(tick)
(tick)
Remote location. This building will not transition to VoIP.

KIN

Kinsolving Dormitory

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

LAC

Lake Austin Center

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

LCH

Littlefield Carriage House

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

LDH

Longhorn Dining Facility

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment Complete.

LFF

Littlefield Fountain

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

LFH

Littlefield Home

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

LLA

LLA Living Learning Center

(tick)
(tick)
(tick)
(tick)
(tick)

 

Deployment complete.

LLB

LLB Living Learning Center

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

LLC

LLC Living Learning Center

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

LLD

LLD Living Learning Center

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

LLE

LLE Living Learning Center

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

LLF

LLF Living Learning Center

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

LTD

Littlefield Dormitory

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

LTH

Laboratory Theater Building

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

MAI

Main Building

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

MHD

Moore-Hill Dormitory

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

PAR

Parlin Hall

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

PCL

Perry-Castaneda Library

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

PF3

Park Forest (Building III)

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

PHD

Prather Hall Dormitory

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

RHD

Roberts Hall Dormitory

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

SAC

Student Activity Center

(tick)
(tick)

 

 

(tick)
(tick)
(tick)
Deployment Complete.

SAG

San Antonio Garage

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

SJG

San Jacinto Garage

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

SJH

San Jacinto Residence Hall

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete. 

SSE

3316 Grandview St

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

SSW

School of Social Work Building

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

SUT

Sutton Hall

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

SZB

George I. Sanchez Building

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

TES

Thermal Energy Storage

(tick)
(tick)
(tick)
(tick)
(tick)
This building will not transition to VoIP.

TRG

Trinity Garage

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

TSC

Lee and Joe Jamail Texas Swimming Center

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

UIL

University Interscholastic League

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

UNB

Union Building

(tick)
(tick)
(tick)
(tick)
(tick)
Deployment complete.

WWH

Walter Webb Hall

(tick)
(tick)
(tick)
(tick)
(tick)

Deployment complete.

 

 

 

 

  

 

 

 

 